Google Links

Follow the links below to find material targeted to the unit's elements, performance criteria, required skills and knowledge

Elements and Performance Criteria

  1. Interpret specifications and organise materials
  2. Fabricate/repair electrical components or parts
  3. Test fabricated/repaired components or parts

Required Skills

Required skills

Look for evidence that confirms skills in

applying relevant OHS practices including the use of PPE and reference to MSDS

using approved repairfabrication procedures and processes relating to electrical cables harnesses antenna leads and aerial components

recognising the integritysecurity of electrical component crimps wire wrapping joints and plugconnector pins

constructing cables harnesses and looms including wire marking to approved industry standards

performing component testing to assess post construction serviceability

Required knowledge

Look for evidence that confirms knowledge of

component and system operation

aircraft wiring specifications and standards

standard repair methods for

electrical cables

ignition harnesses

fire warning system harnesses

coaxial cables such as antenna leads

aerial components

electrical plugs and connectors

soldering methods

fabrication methods for the above wiring and cables

wire marking methods

assembly of electrical cables into wiring looms

relevant OHS procedures

how to obtain relevant MSDS

relevant maintenance manuals

relevant regulatory requirements and standard procedures

Evidence Required

The Evidence Guide provides advice on assessment and must be read in conjunction with the performance criteria required skills and knowledge range statement and the Assessment Guidelines for the Training Package

Overview of assessment

A person who demonstrates competency in this unit must be able to fabricate aircraft electrical looms cables and harnesses in accordance with applicable standards and specifications while observing all relevant safety precautions

Critical aspects for assessment and evidence required to demonstrate competency in this unit

The underlying skills inherent in this unit should be transferable into other areas that require similar techniques It is essential that the general aspects of material specification and selection measurement and fabricationmanufacture are related to specific aircraft component applications

Evidence of knowledge about individual components and their links with systems will be necessary to supplement evidence of ability to interpret requirements and fabricate components before undertaking any action The work plan should take account of applicable safety and quality requirements in accordance with the industry and regulatory standards

A person cannot be assessed as competent until it can be demonstrated to the satisfaction of the workplace assessor that the relevant elements of the unit of competency are being achieved under routine supervision on a representative range of tasks from Groups to in the Range Statement This shall be established via the records in the Log of Industrial Experience and Achievement or where appropriate an equivalent Industry Evidence Guide

Context of and specific resources for assessment

Competency should be assessed in the work environment or simulated work environment using tools and equipment specified by aircraft in the maintenance manuals It is also expected that general purpose tools and test equipment found in most routine situations would be used where appropriate

Method of assessment

Guidance information for assessment


Range Statement

The range statement relates to the unit of competency as a whole. It allows for different work environments and situations that may affect performance. Bold italicised wording, if used in the performance criteria, is detailed below. Essential operating conditions that may be present with training and assessment (depending on the work situation, needs of the candidate, accessibility of the item, and local industry and regional contexts) may also be included.

Note

Range statements listed below are numbered to facilitate specification of the assessment requirements included in the Evidence Guide

Components or parts

Components or parts may include electrical looms, harnesses and cables associated with:

1. Power distribution

2. Ignition

3. Control circuits

4. Signal circuits

Application of this unit may relate to:

scheduled or unscheduled maintenance activities

individual or team-related activities

Procedures and requirements

Refer to industry standard procedures specified by manufacturers, regulatory authorities or the enterprise